Capstone Design Project (Graduation Project) (Spring, 2020)
The graduation Project proceeded for 1 year.
Yewon and I did research on the simulation algorithm and wrote 3 papers.
(IIBC ’20, RTCSA ’20, TII’21)
Journal Article
[1] S. Yoo, Y. Jo, and H. Bahn, "Integrated Scheduling of Real-time and Interactive Tasks for Configurable Industrial Systems,” IEEE Transactions on Industrial Informatics (Under Review)
[2] S. Yoo, Y. Jo, K. Cho, and H. Bahn, “Real-Time Power-Saving Scheduling Based on Genetic Algorithms in Multi-core Hybrid Memory Environments,” The Journal of The Institute of Internet, Broadcasting and Communication (IIBC), vol. 20, no.1, pp.135–140, Feb. 2020. [pdf] π
Conference Proceedings
[2] Y. Jo, S. Yoo, and H. Bahn, "Student Session: Power-Saving Integrated Task Scheduling in Multicore and Hybrid Memory Environment," 2020 IEEE 26th International Conference on Embedded and Real-Time Computing Systems and Applications (RTCSA), Gangnueng, Korea (South), 2020, pp. 1-2 [pdf] π
Comments
Post a Comment